|
DOWNLOAD MY CV
1.
PERSONAL DETAILS
2.EDUCATIONAL RECORD/QUALIFICATIONS
3. EMPLOYMENT HISTORY
4. CONTRACT WORK
5. PERSONAL INTERESTS
6. OVERVIEW
1.
PERSONAL DETAILS
2.EDUCATIONAL RECORD/QUALIFICATIONS
|
Fischer Rosemond Jan
2002
|
|
|
Delta
V Implementation
|
|
|
Brighton Technical
College Jan 1999 |
|
|
Siemens Step 5 Level 1 |
|
|
Siemens Step 5 Level 2 |
|
|
University of Central
England 1993 to 1997 |
|
|
B.Eng. Hon. Degree
Electronic engineering |
|
|
Matthew Bolton
Technical College
Foundation year
1992/1993
|
|
|
Stafford Technical
College
City & Guilds
|
|
|
Computer
programming |
|
|
GCSE |
|
|
computer
programming |
|
|
Accounts |
|
|
Maths |
|
|
Physics |
|
|
Chemistry |
|
|
Technical drawing |
|
|
Metalwork |
|
|
English |
|
|
|
|
3. EMPLOYMENT HISTORY
|
Contracting |
December 1998/Present
See
Section 4
|
|
|
|
|
Data Solutions |
September1998/December1998 |
|
Severn Trent Water
Treatment Control Systems |
|
Heathrow Airport Baggage
Tracking Systems |
|
Instem Computer
Systems |
June 1997/September
1998 |
|
PLC Programming |
|
System Design – part of
Ironbridge project – I/O allocation, devices, cards required, software etc. |
|
Design specification
written for customer requirements. |
|
Control Systems |
|
Site Commissioning |
|
Commissioning Power
Station Control Systems including Ironbridge. |
|
Nuclear Waste Handling
Control Systems including SDP Sellafield
SDP PLC’s using Concept Modicon from Concise Database
|
|
Fault Finding and Problem
Solving |
|
Production of Training
Manuals |
|
Advising and Supervising
Graduates and trainee’s |
|
Positions Held |
|
Systems Engineer |
|
Lead Engineer |
|
Lucas Aerospace |
Placement 1995/1996 |
|
Evaluation of plastic
encapsulated devices for use in aerospace |
|
Maintain Approved
Component database |
|
Maintain plastic
component database |
|
Fracas - component
failure investigation |
|
Fibre optic harness study |
|
Design and Produce Fibre
optic database |
|
Digital Electronics |
|
Microprocessors |
|
CAN bus systems |
|
Help with PC support |
|
Summit Engineering |
Part Time 1995/1997 |
|
Maintain Computer Network |
|
Upgrade, build and
maintain computers |
|
Computer Training |
|
Airport Plant
Maintenance |
Part Time 1992/1995 |
|
Airport Plant
Maintenance |
Full Time 1981/1992 |
|
Positions Held |
|
Mechanic |
|
Emergency Breakdown
Mechanic |
|
Auto Electrician |
|
Breakdown Co-ordinator |
|
Forecourt Manager |
|
Acting Workshop Manager |
|
Office Supervisor |
|
Supervisory Key
Responsibilities |
|
Breakdown Co-ordinator |
|
Oversee 4-5 breakdown
staff |
|
Organise and control
breakdown team |
|
Ensure fast and efficient
response to breakdowns |
|
Making instant decisions |
|
Forecourt manager |
|
Oversee 3-4 staff |
|
Design and enforce duty
rosters |
|
Control fuel and
forecourt stock levels |
|
Responsible for safety
and maintenance |
|
Acting workshop
manager |
|
Oversee 5-6 staff |
|
Delegate duties |
|
Monitoring work flow |
|
Ensure Quality control |
|
Stock control and parts
ordering |
|
Administration functions
associated with the smooth running of the department |
|
Office supervisor |
|
Introduction and
implementation of computer system |
|
Develop and control new
administration techniques |
|
Repair and maintenance
key responsibilities |
|
Breakdown and recoveries |
|
Diagnose and rectify
problems |
|
Working as a team |
|
Auto Electrician |
|
Trace and diagnose
electrical problems |
|
Reading schematics |
|
Decoding car HI-FI
equipment |
|
Minor repairs on car
HI-FI equipment |
|
Circuit board repairs |
4. CONTRACT WORK
I would consider any UK or overseas
position.
Commissioning Engineer
Control Systems Engineer
PLC Software Engineer
|
Date |
Employer/Agent |
Position Held |
|
Sep2003/Present |
Cytek/Emerson
|
Commissioning/Systems Engineer |
Pharmaceuticals - Delta V - Allen Bradley
Drug Substance
and Drug Product
Batch Process System working Within GAMP and 21CFR11
Guidelines
Qual 125 VALN 10 procedures
SFAT, SAT ,OQ and PQ
System Design -
Delta V and Allen Bradley Serial Interface
Fault Finding on DeltaV Phases
Internal Testing and Implementing code changes
Supporting other Testers and Process Teams
Working On Site in Clean Room
Conditions
|
Date |
Employer/Agent |
Position Held |
|
July2000/Sep
2003 |
Cytek/Pfizer
|
Commissioning/Automation Analyst |
Pfizer Pharmaceuticals - Moores APACS - Delta V
- Allen Bradley
Process System
Code Writing Moors APACS PLC’s – Some Delta_V
– Some Siemens S7
Code Debugging and System Maintenance
Ladder - Structured Text – Sequential Flow Charts
– Function Block
System Design and Implementation.
Documentation and Databases
System Testing and debugging
Intellution Fix
Isis
|
6 Jun/7 July 2000 |
Static
Systems/Short Term |
Commissioning
Engineer |
Hospital Nurse Call System Queen Elizabeth Woolwich
London
Loop Checking
Installation Checks
Fault Finding
Wiring
and installation
|
7 Feb/ 27 Feb
2001
|
Grenco/Aztek
|
Commissioning/Systems
Engineer
|
Cigarette Production
Phillip Morris, Berlin, Germany
Refrigeration System
Modicon Concept
Commissioning and
Code writing
Fault Finding
Software and Electrical
Panel Wiring
Modifications
|
24 Nov/ 24 Dec
2000
|
USF/Aztek
|
Commissioning/Systems Engineer
|
Water Treatment
Coding and Fault Finding Allen Bradley SLC500 – RSLogix5
Panel Testing.
Test Rig Configuration
Works Acceptance Testing
|
24 Apr/ Dec 1999 |
FMA/LA Int. |
Commissioning/PLC Engineer |
Allen Bradley PLC5/250
Allen Bradley RSLogix5 with control
net.
Commissioning Coffee production
plant for Kraft Jacob Suchard.
Commissioning Brewery Plant -
Morland Abbingdon - Keg Racking System
Fault finding debugging and code
changes.
Writing code for the brewery
industry - Morland Abbingdon - Bass Cape Hill – CIP Sets
RSView with Visual Basic
Writing simulation code - PICS
Simulation of PLC code
|
February/March
1999 |
FCA/SPRING |
Commissioning Engineer |
Modicon Quantum PLC’s with Modsoft software using
Modbus plus and Ethernet networks.
Fault finding/software diagnostics and Commissioning
of baggage tracking and screening system at
Gatwick Airport.
|
Dec/Jan 1998/99 |
B.A.A/ SPRING |
Software Systems Engineer |
Allen Bradley PLC5 with control net.
Fault finding/software diagnostics and change
recommendations for baggage tracking and
Screening system at Heathrow Airport. Ladder code
modifications.
5. PERSONAL INTERESTS
Computers, Electronics,
Collecting Phone cards, Restoration of Antique Jukeboxes, DIY,
clay pigeon Shooting, Motor
Mechanics, Paragliding,, Flying, Cryonics.
6. OVERVIEW
|
As evident from the
detail contained in my CV I have the ability to adapt to a wide range of
Situations and have an outside interest in the type of work I am seeking. I
wish to secure a position with a well-respected company, which would enable
me to fully Utilise my abilities. I consider myself to be hardworking and
eager to please. |
|
Strengths I would
bring to such a position include |
|
Reliability- I have a
stable work background |
|
Versatility and Eager to
learn |
|
A sense of humour |
|
Loyalty |
|
Commitment and a
"right first time approach" |
|
Pascal Programming |
|
Assembler Programming |
|
APACS Programming -
Moores |
|
Modicon Programming -
Concept - Modsoft – Modbus – Modbus plus |
|
Some
Siemens Step 5 and S7 |
|
Ladder Logic - Rslogix -
Allen Bradley PLC5,PLC5-250 - Mitsubishi Medoc |
|
Delta V
|
|
Microcode |
|
PICS Simulation
|
|
Some SCADA Experience, Rsview -
Factory Link - Panel Builder - IFix - Ibatch , RSBatch
|
|
|
|
Basic Programming |
|
Word Perfect |
|
Microsoft - Access -
Word- Excel |
|
Lotus |
|
CAD |
|
PC networks |
|
Various other computer
packages |
|
|
|
Associate Member of the
IEE |
|
Graduate Member BCS |
|
Given the opportunity I
am confident I would be an asset to your company. |
|